High-lift Submersible Pump-SPS

High-lift Submersible Pump-SPS

SPS series high-lift multistage submersible pumps with stainless steel casing, will be your ideal drainage helper. Especially for the application of construction site, mine enterprises, field work etc. The main parts of this pumps is made of stainless steel and PPO, which has high corrosion resistance. The frame assured the long running without overhead

Description

High-lift Submersible Pump

Function and Feature:

SPS series high-lift multistage submersible pumps with stainless steel casing, will be your ideal drainage helper. Especially for the application of construction site, mine enterprises, field work etc. The main parts of this pumps is made of stainless steel and PPO, which has high corrosion resistance. The frame assured the long running without overhead.

This pumps with features of long working life, easy to maintenance, complete todrain, convenience to use.

Thermal protector fixed inside the motor (single phase only) can cut off the power when overheated or over current, to guarantee the security and reliability of pump’s run even in the atrocious environment

Condition of usage:

1. The maximum deep it is allowed in water is 5m from its center of impeller;
2. The trans medium’s temperature shouldn’t be higher than 40℃;
3. The trans medium’s PH value scope is from 6.5 to 8.5;
4. The grain diameter of the solids in the water is no bigger than 0.2mm

Installation:

1. Before installation, must check whether the cable damaged, scratched, broken. If they are faulty, must consult dealer or technician qualified to replace it.

2.The earth wire(yellow and green wire) must be earthed reliably

3.Check whether the power supply is conformed to the stipulation of nameplate before installation. Power supply connected with the pump must assembled with electricity-leaking circuit breaker. The wave of voltage must controlled with+-10% of the rated.

4.Using iron thread or hoop to make the outlet and discharge pipe tight. Then tie a rope on the handle. Cable absolutely prohibited to be as sling to move the pump up and down.

5. Don’t touch and move the pump before cut-off the power to keep safe

6. Be sure that the cable is far from the heat, oil and sharp

7. The pump must install far from the human and livestock. Warning nameplate should placed at the installation location

Related Important Resources

Download Catalog

Download Center

Video Factory Production

Reviews

There are no reviews yet.

Be the first to review “High-lift Submersible Pump-SPS”

Your email address will not be published. Required fields are marked *

Open Chat
1
Need Help?
Hello,
Can we help you?
HT Pumps, Professional Water Pumps Supplier